中国水土保持科学2012,Vol.10Issue(6):1-5,5.
黄土坡面细沟侵蚀过程
Rill erosion processes on loess hillslope
摘要
Abstract
Based on multi-plot-based experiments of simulated rainfall with steady in-flow rate, the erosion processes of rill on loess hillslope were simulated. Results show that; Power functions could preferably describe the rise trend of rill erosion rate with increasing runoff under different slopes and rainfall intensities, especially under different slopes. Rill erosion modulus increases with increasing slope and rainfall intensities, which could be described by exponential equation for different slopes, logarithmic equation for different rainfall intensities, and dual power equation for different slopes and rainfall intensities at the same time. Flow shear stress is the dynamic source for the development of rill erosion processes.关键词
细沟侵蚀/侵蚀过程/组合小区/切应力/黄土坡面Key words
rill erosion/ erosion processes/ multi-plot/ shear stress/ loess hillslope引用本文复制引用
谭贞学,王占礼,王莎,刘俊娥..黄土坡面细沟侵蚀过程[J].中国水土保持科学,2012,10(6):1-5,5.基金项目
国家自然科学基金"黄土坡面细沟侵蚀过程组合小区试验研究"(40971172),"黄土坡面细沟侵蚀关键参数及其耦合关系试验研究"(41171227) (40971172)