首页|期刊导航|北京交通大学学报|PBA法扩挖大直径盾构隧道修建地铁车站地表沉降控制

PBA法扩挖大直径盾构隧道修建地铁车站地表沉降控制

王芳 贺少辉 汪挺 刘军 曹瑞琅

北京交通大学学报2013,Vol.37Issue(1):34-39,6.
北京交通大学学报2013,Vol.37Issue(1):34-39,6.

PBA法扩挖大直径盾构隧道修建地铁车站地表沉降控制

Control standard for ground surface settlement in enlarging shield tunnel by PBA method to build metro station

王芳 1贺少辉 1汪挺 2刘军 3曹瑞琅1

作者信息

  • 1. 北京交通大学土木建筑工程学院,北京100044
  • 2. 北京市政建设集团有限责任公司,北京100045
  • 3. 北京建筑工程学院土木与交通工程学院,北京100044
  • 折叠

摘要

Abstract

The experiment section of Beijing metro line 14 is constructed by earth pressure balance shield machine,and the shield tunnel will be enlarged by Pile-Beam-Arch method(PBA method) to form the metro station. This method can effectively and safely solve the contradiction between the construction of metro station and shield tunnel,but there is not similar engineer. The empirical formulas of predicting the ground surface settlement, the related statistics data and specifications, and numerical simulation methods are used to predict the ground surface settlement caused by the large diameter shield tunnel enlarged by PBA method in construction process. Combined with the ground surface settlement control reference values of Beijing metro station and the statistic data of existing metro station statistics, the ground settlement control standard is put forward. In accordance with the three class control management methods, the ground surface settlement is controlled step by step. The research results have some reference value to guide the engineering construction.1

关键词

大直径盾构隧道/PBA法扩挖/地铁车站/地表沉降/控制标准

Key words

large diameter shield tunnel/ enlarged by PBA method/ metro station/ ground surface settlement/ control standard

分类

交通工程

引用本文复制引用

王芳,贺少辉,汪挺,刘军,曹瑞琅..PBA法扩挖大直径盾构隧道修建地铁车站地表沉降控制[J].北京交通大学学报,2013,37(1):34-39,6.