铁道科学与工程学报2012,Vol.9Issue(6):24-29,6.
隧道管棚加预注浆超前支护数值模拟分析
Numerical simulation analysis for pipe-shed and pre-grouting reinforcement of tunnel
摘要
Abstract
As two important auxiliary methods in tunnel construction , pipe - shed and pre - grouting plays a major role in preventing tunnel collapse, controlling surface subsidence and inhibiting ground displacement. Therefore, the two pre - reinforcement methods were widely used in our country. FLAC3D finite difference software was used to build four excavation models for numerical simulation analysis, including pipe - shed and pre - grouting model, only pipe - shed pre - support model, only pre - grouting support model and without any pre - support model. The effect of actions on controlling the stress, displacement and surface subsidence of tunnel are studied.关键词
管棚支护/预注浆加固/数值模拟Key words
pipe - shed support / pre - grouting / numerical simulation分类
建筑与水利引用本文复制引用
袁海清,傅鹤林,马婷,谭鑫,郭磊..隧道管棚加预注浆超前支护数值模拟分析[J].铁道科学与工程学报,2012,9(6):24-29,6.基金项目
国家自然科学基金资助项目(50878213) (50878213)
长沙市科技局项目(K0902027-11) (K0902027-11)
湖南省交通科技项目 ()
贵州省科技厅重大专项项目 ()