| 注册
首页|期刊导航|计算机工程与应用|差分进化法在风电并网系统中的应用

差分进化法在风电并网系统中的应用

匡洪海 吴政球 李圣清 李军军

计算机工程与应用2013,Vol.49Issue(2):39-42,56,5.
计算机工程与应用2013,Vol.49Issue(2):39-42,56,5.DOI:10.3778/j.issn.1002-8331.1210-0239

差分进化法在风电并网系统中的应用

Application of differential evolution algorithm in wind power integrated system

匡洪海 1吴政球 2李圣清 1李军军2

作者信息

  • 1. 湖南大学电气与信息工程学院,长沙410082
  • 2. 湖南工业大学电气与信息工程学院,湖南株洲412007
  • 折叠

摘要

Abstract

In order to solve stability problem of multi-machine wind power integrated system, Power System Stabilizers(PSSs) are installed for Synchronous Generator(SG), using Differential Evolution(DE) algorithm to solve the optimal regulation problem of Automatic Voltage Regulator( AVR) and PSS parameters in SG. Under the situation of with or without PSS and whether using differential evolution algorithm, the stability of wind power integrated system is studied. The research shows that wind power integrated system has good damping effect by AVR-PSS coordinated tuning based on DE algorithm, can reduce oscillation of rotor angle difference and improve voltage stability. Simulation results show that the stability of wind power integrated system can be greatly improved through using the DE algorithm.

关键词

差分进化法/自动电压调节器/电力系统稳定器/风电并网系统/暂态稳定

Key words

differential evolution algorithm/ Automatic Voltage Regulator (AVR)/ Power System Stabilizer(PSS)/ wind power integrated system/ transient stability

分类

信息技术与安全科学

引用本文复制引用

匡洪海,吴政球,李圣清,李军军..差分进化法在风电并网系统中的应用[J].计算机工程与应用,2013,49(2):39-42,56,5.

基金项目

国家自然科学基金项目(No.51077046) (No.51077046)

湖南省科技厅重点项目(No.2008FJ2003) (No.2008FJ2003)

校自科基金(No.2011HZX08) (No.2011HZX08)

湖南省教育厅科研项目(No.12C0054). (No.12C0054)

计算机工程与应用

OACSCDCSTPCD

1002-8331

访问量0
|
下载量0
段落导航相关论文