基于PowerBuilder DataWindow的项目进度管理的设计与实现
Design and Implementation of Project Schedule Management Based on PowerBuilder' s DataWindow
黄越 1游丹 1杨存榜 1熊勇1
作者信息
- 1. 中国工程物理研究院激光聚变研究中心,四川绵阳621900
- 折叠
摘要
Abstract
This paper introduces the thought and the methodology to implement the project schedule management by using Data Window, under the developing environment of PowerBuilder 10. Traditionally, the schedule management interface reveals the schedule of the project by the data in data list. This schedule management interface is similar to Gunter graph, using bar chart instead of pure data, which directly reveals the project' s schedule.关键词
进度管理/DataWindow/数据库/PowerBuilderKey words
schedule management/ Data Window/ database/ PowerBuilder分类