基于NSGA-Ⅱ的模糊多目标产品开发项目调度

张连营 查鸿

计算机应用研究2013,Vol.30Issue(1):64-66,3.
计算机应用研究2013,Vol.30Issue(1):64-66,3.DOI:10.3969/j.issn.1001-3695.2013.01.015

基于NSGA-Ⅱ的模糊多目标产品开发项目调度

NSGA-Ⅱ based fuzzy multi-object product development project scheduling approach

张连营 1查鸿1

作者信息

  • 1. 天津大学管理与经济学部,天津300072
  • 折叠

摘要

Abstract

Aiming at the time and cost tradeoff problem in product development project scheduling with fuzzy durations, this paper considered the effect of decision -makers' risk preference on time and cost tradeoff in fuzzy environment further, and it introduced NSGA- Ⅱ to solve the problem in project example. The results show that by means of adjusting the values of risk acceptance level and optimism index, different Pareto sets are obtained, from which the decision can choose the preferred scheduling alternative.

关键词

项目调度/模糊/工期—成本均衡/风险偏好/NSGA-Ⅱ

Key words

project scheduling/ fuzzy/ time-cost tradeoff/ risk preference/ NSGA-Ⅱ

分类

信息技术与安全科学

引用本文复制引用

张连营,查鸿..基于NSGA-Ⅱ的模糊多目标产品开发项目调度[J].计算机应用研究,2013,30(1):64-66,3.

基金项目

国家自然科学基金资助项目(70871088) (70871088)

计算机应用研究

OA北大核心CSCDCSTPCD

1001-3695

访问量0
|
下载量0
段落导航相关论文