| 注册
首页|期刊导航|工矿自动化|基于Multipath的煤矿巷道三维模型构建方法

基于Multipath的煤矿巷道三维模型构建方法

杨帆 李崇贵

工矿自动化2012,Vol.38Issue(12):58-62,5.
工矿自动化2012,Vol.38Issue(12):58-62,5.

基于Multipath的煤矿巷道三维模型构建方法

3D Modeling Method of Mine Laneway Based on Multipath

杨帆 1李崇贵1

作者信息

  • 1. 西安科技大学测绘科学与技术学院,陕西西安 710054
  • 折叠

摘要

Abstract

To solve problems of poor flexibility and portability and difficult update and maintenance of data in existing mine laneway 3D models, a 3D modeling method of mine laneway based on multipath was proposed. By defining point-polyline topological data model, the method can convert CAD format mine data to Geodatabase feature class, and uses developed ArcGIS Engine program and inserts node coordinate to create 3D mine laneway model, so as to realize automatic modeling of mine laneway, which effectively reduces working capacity of 3D laneway modeling.

关键词

煤矿巷道/3D建模/Multipath/CAD数据/Geodatabase

Key words

mine laneway/3D modeling/ Multipath/CAD data/Geodatabase

分类

矿业与冶金

引用本文复制引用

杨帆,李崇贵..基于Multipath的煤矿巷道三维模型构建方法[J].工矿自动化,2012,38(12):58-62,5.

基金项目

陕西省科学研究发展计划项目(2012K06-07) (2012K06-07)

工矿自动化

OA北大核心CSTPCD

1671-251X

访问量0
|
下载量0
段落导航相关论文