| 注册
首页|期刊导航|起重运输机械|翻车机端环轨道接头扣件改造

翻车机端环轨道接头扣件改造

邱良

起重运输机械Issue(1):110,1.
起重运输机械Issue(1):110,1.

翻车机端环轨道接头扣件改造

Improvement to dumper end ring rail joint fastener

邱良1

作者信息

  • 1. 国投中煤同煤京唐港口有限公司 唐山063611
  • 折叠

摘要

Abstract

After the expansion force of the expansion sleeve of bucket-wheel stacker/reclaimer is reduced, slipping occurs when the reclaiming amount is quite large, which seriously effects normal operation of coal distribution and feeding. Temporary measure of welding strengthening plates is taken, and a certain period of actual practice shows that it can meet normal operational need.

关键词

Bucket-wheel stacker/reclaimer/ expansion sleeve/ strengthening

Key words

Bucket-wheel stacker/reclaimer/ expansion sleeve/ strengthening

引用本文复制引用

邱良..翻车机端环轨道接头扣件改造[J].起重运输机械,2013,(1):110,1.

起重运输机械

OACSTPCD

1001-0785

访问量0
|
下载量0
段落导航相关论文