实施北本水电项目面临的风险及控制应对措施

邓波

水力发电2012,Vol.38Issue(12):70-73,4.
水力发电2012,Vol.38Issue(12):70-73,4.

实施北本水电项目面临的风险及控制应对措施

Construction Risks of Laos's Pak Beng Hydropower Project and Its Control

邓波1

作者信息

  • 1. 大唐(老挝)北本水电有限公司,老挝万象
  • 折叠

摘要

Abstract

The Pak Beng Hydropower Station is the first large-scale hydropower project developed by China Datang Group Corporation in Laos by BOT mode, and it will be constructed in 2012. Based on the actual conditions of Pak Beng project, the risks caused by BOT mode are analyzed. The controls and measures which are help to reduce or eliminate the risks in the construction and operation of project are studied to guarantee the achievement of investment objectives.

关键词

BOT方式/北本水电项目/投资风险/风险控制/湄公河/老挝

Key words

BOT mode/ Pak Beng Hydropower Project/ investment risk/ risk control/ Mekong River/ Laos

分类

管理科学

引用本文复制引用

邓波..实施北本水电项目面临的风险及控制应对措施[J].水力发电,2012,38(12):70-73,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量2
|
下载量0
段落导航相关论文