市场环境下梯级水电站短期优化调度研究

徐刚

水力发电2013,Vol.39Issue(1):67-70,4.
水力发电2013,Vol.39Issue(1):67-70,4.

市场环境下梯级水电站短期优化调度研究

Research on Short-term Scheduling of Cascade Hydropower Stations in Electricity Market

徐刚1

作者信息

  • 1. 三峡大学水利与环境学院,湖北宜昌443002
  • 折叠

摘要

Abstract

Under market environment, the short-term scheduling of cascade hydropower stations in bidding phase of generation plan is formulated according to the forecasts of marginal price and inflow and the objective of maximizing generation revenue, and in the implementation phase of assigned load, it is developed according to 96 points assigned load and forecasted inflow. If the cascade stations in a river basin implement uniform price of generation, minimizing water consumption is the objective of short-term scheduling, otherwise generating maximum revenue is the goal. The short-term scheduling model and solution algorithm in two phases are studied herein for constructing the framework of short-term scheduling of cascade hydropower stations in electricity market. The results show that using different model in different phase respectively can save water resources and increase generating revenue under electricity market environment.

关键词

优化调度/短期/梯级水电站/市场环境

Key words

scheduling optimization/ short-trem/ cascade hydropower station/ market environment

分类

建筑与水利

引用本文复制引用

徐刚..市场环境下梯级水电站短期优化调度研究[J].水力发电,2013,39(1):67-70,4.

基金项目

环保公益性行业科研专项项目(2008467086) (2008467086)

水力发电

OA北大核心CSTPCD

0559-9342

访问量3
|
下载量0
段落导航相关论文