龙开口水电站碾压混凝土施工关键环节质量控制

陈利刚 邰先高

水力发电2013,Vol.39Issue(2):66-67,77,3.
水力发电2013,Vol.39Issue(2):66-67,77,3.

龙开口水电站碾压混凝土施工关键环节质量控制

Quality Control Measures in Key Construction Processes of Longkaikou RCC Dam

陈利刚 1邰先高1

作者信息

  • 1. 中国水利水电建设工程咨询昆明公司,云南昆明650051
  • 折叠

摘要

Abstract

The Longkaikou Hydropower Station locates at a hot, dry and windy region, and the dolomite is abundantly used as concrete aggregate for the first time in China. The construction quality of RCC is difficult to control. A series of quality control measures are implemented in key construction processes of mix proportion determination, concrete transportation, spreading and leveling and compacted, interlayer bonding control and distorted concrete construction. The powder content of artificial sand is controlled at 17% and the content of micronized powder is not less than 5%. The concrete transportation to placement surface is mainly taken by trucks and supplemented by chute shafts and belt conveyors. The compaction of concrete is controlled by digital dam system. These measures ensure the rapid and continue large-surface concrete placement and the quality of concrete meeting design requirements.

关键词

质量控制/碾压混凝土施工/关键环节/龙开口水电站

Key words

quality control/ RCC construction/ key process/ Longkaikou Hydropower Station