水力发电2013,Vol.39Issue(2):87-89,3.
高强度压力钢管焊接与施工研究
Study on Welding of High Strength Penstocks
王文明 1李文革 1罗意成 1张振升1
作者信息
- 1. 中国水利水电第八工程局有限公司,湖南长沙410007
- 折叠
摘要
Abstract
The characteristics, welding technologies and welding of high-strength penstocks in Longkaikou Hydropower Station are introduced herein. The on-site supervision inspection shows that the manufacturing and installation of penstocks in Longkaikou project has a pass rate of 100% and an excellent rate of 97% in first acceptance check.关键词
压力钢管/焊接工艺/龙开口水电站Key words
penstock/ welding technology/ Longkaikou Hydropower Station分类
建筑与水利引用本文复制引用