| 注册
首页|期刊导航|水利水电科技进展|岩溶地基中超长桩承载力数值计算方法

岩溶地基中超长桩承载力数值计算方法

刘思思 江学良 李珍玉

水利水电科技进展2013,Vol.33Issue(1):27-32,6.
水利水电科技进展2013,Vol.33Issue(1):27-32,6.DOI:10.3880/j.issn.1006-7647.2013.01.006

岩溶地基中超长桩承载力数值计算方法

Method for calculating bearing capacity of super-long pile in Karst region

刘思思 1江学良 1李珍玉1

作者信息

  • 1. 中南林业科技大学土木工程与力学学院,湖南长沙410004
  • 折叠

摘要

Abstract

According to complex foundations including channeling and Karat caves in a Karst region, a new method for calculating the bearing capacity of a super-long pile was presented. First, a calculation model of pile lateral friction in Karst stratum was established. Second, energy balance equations of a super-long pile in non-Karst stratum and Karst stratum were deduced, respectively. Based on it, a displacement formula and axial force formula of the pile unit were determined. Third, the pile incremental potential energy formula was derived from the principle of minimum potential energy, with the golden section method as program convergence algorithm. At last, taking an engineering pile in the Zishui Bridge foundation as an example, the bearing capacity was calculated using the method proposed in this paper. Calculation results show that this method is reasonable and practicable, and can provide a scientific reference for research and design in actual projects.

关键词

超长灌注桩/岩溶地区/承载力/数值计算/最小势能原理

Key words

super-long pile/ Karst region/ bearing capacity/ numerical calculation/ minimum potential energy principle

分类

建筑与水利

引用本文复制引用

刘思思,江学良,李珍玉..岩溶地基中超长桩承载力数值计算方法[J].水利水电科技进展,2013,33(1):27-32,6.

基金项目

国家自然科学基金(51108470) (51108470)

湖南省科技计划(2011TT2061) (2011TT2061)

水利水电科技进展

OA北大核心CSCDCSTPCD

1006-7647

访问量0
|
下载量0
段落导航相关论文