水文地质工程地质2013,Vol.40Issue(1):89-92,128,5.
雅鲁藏布江中游某水电站库区泥石流工程影响分析
Impacts of debris flows on the reservoir of a hydropower station in the middle of the Yarlung Zangbo River
摘要
Abstract
There are 11 mud-rock flow channels in the reservoir of a hydropower station in the middle of the Yarlung Zangbo River. Frequency of the occurrence of debris flow is low. This paper comprehensively analyzes the effect of mud-rock flow in the dam site on project mainly through analyzing the fatalness of each mud-rock flow in the reservoir, the possibility of blocking up and the impact on hydropower station job projection. Among these channels, three channels are near the dam site and have great influence on waterwork in the dam site and construction safety. The results indicate the debris flow activities in the study area will not result in blocking of the main channel that possibly brings about flood in the down stream of the river.关键词
雅鲁藏布江/泥石流/危险性/工程影响/堵江Key words
Yarlung Zangbo River/debris flow/risks/impact of engineering/blocking river分类
天文与地球科学引用本文复制引用
李文强,石豫川,王敬勇..雅鲁藏布江中游某水电站库区泥石流工程影响分析[J].水文地质工程地质,2013,40(1):89-92,128,5.基金项目
地质灾害防治与地质环境保护国家重点实验室自由探索基金(SKLGP2011Z009) (SKLGP2011Z009)