铁道标准设计Issue(1):17-20,4.
斜向水泥土桩法加固既有铁路路基施工技术研究
Research on Construction Technology of Strengthening the Existing Railway Subgrade by Oblique Soil Cement Pile
摘要
Abstract
Oblique soil cement pile is a suitable method for quickly strengthening the existing subgrade under the condition of train running. Based on systematic research and summary of its construction technology, the paper put forward the construction procedure and equipment integration for oblique soil cement pile method, and put forward the measures and notes so as to ensure the safety during construction and train operation. Meanwhile, the prevention and treatment methods against the common problems in the construction were proposed.关键词
铁路路基/斜向水泥土桩/快速加固Key words
railway subgrade/ oblique soil cement pile/ quick strengthening分类
交通工程引用本文复制引用
王铸,宋绪国..斜向水泥土桩法加固既有铁路路基施工技术研究[J].铁道标准设计,2013,(1):17-20,4.基金项目
国家高技术研究发展计划(863)(2009AA11Z101) (863)