| 注册
首页|期刊导航|铁道标准设计|高速铁路悬臂现浇连续梁桥后期徐变影响因素分析

高速铁路悬臂现浇连续梁桥后期徐变影响因素分析

姚成钊

铁道标准设计Issue(1):66-69,4.
铁道标准设计Issue(1):66-69,4.

高速铁路悬臂现浇连续梁桥后期徐变影响因素分析

Analysis of Influence Factors on Creep Deformation in Later Period of Cast-in-situ Continuous Girder Bridge by Cantilever Method on High-speed Railway

姚成钊1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉430063
  • 折叠

摘要

Abstract

Under the action of long-term loads, the creep deformation will cause the upwarp and downwarp of large-span prestressed-concrete continuous girder bridge. The ballastless track can meet the requirements of high smoothness and high stability of current high-speed railway code, but the adjustability is small. Through establishing finite element models for several continuous girders with different spans, the influences on creep deformation in later period because of the main factors were analyzed, including the concrete elastic modulus E, pre-stressed concrete tension age t , different creep deformation calculation model, and the time of the second-order dead load. The results show that the elastic modulus of concrete must meet the design requirements, the concrete age when tensioning the tendons may be properly adjusted according to specific calculation results, the differences among the calculation results of different creep deformation calculation models are larger, and postponing the time of the second-order dead load can reduce the creep deformation obviously.

关键词

高速铁路/预应力混凝土连续梁桥/无砟轨道/后期徐变/影响因素

Key words

high-speed railway/ prestressed-concrete continuous girder bridge/ ballastless track/ creep deformation in later period/ influence factors

分类

交通工程

引用本文复制引用

姚成钊..高速铁路悬臂现浇连续梁桥后期徐变影响因素分析[J].铁道标准设计,2013,(1):66-69,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文