| 注册
首页|期刊导航|铁道标准设计|罗布泊盐湖岩盐路基设计及施工方法研究

罗布泊盐湖岩盐路基设计及施工方法研究

谢德江

铁道标准设计Issue(2):12-15,4.
铁道标准设计Issue(2):12-15,4.

罗布泊盐湖岩盐路基设计及施工方法研究

Research on Design and Construction Method of Halite Subgrade of Lop Nor Salt Lake

谢德江1

作者信息

  • 1. 新疆铁道勘察设计院有限公司,乌鲁木齐830011
  • 折叠

摘要

Abstract

Lop Nor Railway is a part of Hami-Lop Nor Railway which goes across salt lake lacustrine plain area, the stratum is mainly composed of sulfate-halite. Because the haul distance for permeable subgrade filler is too far, and considering the concept of environment protection, halite subgrade was used for this part. This article expounds the sulfate-halite hazard, analyzes the feasibility and necessity of constructing sulfate-halite subgrade, discusses subgrade design, ground treatment and drainage design respectively. The success implementation of the project fills up the blank of sulfate-halite subgrade design, provides the necessary technical accumulation for Hami-Lop Nor Railway extending to Ruoqiang, and can play a guiding role in design and construction for halite subgrade.

关键词

岩盐路基/复合土工膜/溶蚀孔洞/重型碾压

Key words

halite subgrade/ composite geomembrane/ solution porosity/ heavy compaction

分类

交通工程

引用本文复制引用

谢德江..罗布泊盐湖岩盐路基设计及施工方法研究[J].铁道标准设计,2013,(2):12-15,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文