| 注册
首页|期刊导航|武汉工程大学学报|喜人公司磷矿通风系统及排水系统施工

喜人公司磷矿通风系统及排水系统施工

闫德传 胡文军 胡章地

武汉工程大学学报2012,Vol.34Issue(11):30-33,64,5.
武汉工程大学学报2012,Vol.34Issue(11):30-33,64,5.DOI:10.3969/j.issn.1674-2869.2012.11.007

喜人公司磷矿通风系统及排水系统施工

Construction of ventilation system and drainage system in Xiren phosphorus mine

闫德传 1胡文军 2胡章地3

作者信息

  • 1. 湖北钟祥喜人化工有限公司,湖北荆门448000
  • 2. 武汉工程大学环境与城市建设学院,湖北武汉430074
  • 3. 武汉工程大学法商学院,湖北武汉430074
  • 折叠

摘要

Abstract

In order to eliminate the differences between mining design scheme and actual situation of the corporation, central-diagonal ventilation was adopted in ventilation system, according to the author's experience of construction in Xiren phosphorus mine. Air entered main shaft and came out from ramp No. 1 and ramp No. 2, without extra air shaft. By means of changing the plan, cost of driving wind well and ventilation was cut down. Besides, wind resistance was reduced. Multistage drainage was replaced by single-stage drainage plan. Additionally, the capacity of water sump and the storage time were increased. In the amended plan, investment for water sump and pump room on -10m level is canceled. Thus, the personnel management cost of the two pump rooms on-10m level and +40m level is cut down. Although the investment of water sump is increased for the sake of increasing capacity, off-peak power consumption in the depressed time is realized and drainage cost is reduced.

关键词

矿山/施工/设计/施工管理/通风系统/排水系统

Key words

mine/ construction/ design/ construction management/ ventilation system/ drainage system