摘要

Abstract

According to the geological conditions at the 8210 longwall face in Jinhuagong Mine of Datong Coal Mine Group, the integrated research method including theoretical analysis and field observations were used to study the reasonable support working resistance for the great mining height longwall face with hard roof. The results indicated that the hard roof liable to form a "Hard-Hard" type double rock beams structure, the support working resistance has to satisfy the requirement of both limited deformation in the lower rock beam and given deformation in the upper rock beam. As a result, the support working resistances before and after roof caving compulsively, in the 8210 longwall face, were calculated to 18000kN and 11 000 kN, respectively, thus determined the longwall face support type to ZZ1300/28/60,these results enabled the thick seam with hard roof mining safely and efficiently.

关键词

坚硬顶板/大采高综采/支架工作阻力/强制放顶

Key words

hard roof/ great mining height/ support working resistance/ roof caving compulsively