An in- service welding experiment,study on the thermal cycle by in — service welding 16MnR steel in different welding conditions, was carried out based on self - made static simulated test equipment. The results show that the peak temperature is higher and the cooling time is longer in air cooling condition than in water cooling condition. The peak temperature elevates and the cooling time obviously extends with the increase of welding heat input. Less than the critical thickness, the cooling time shortens when the slab thickness increases. No less than the critical thickness, the slab thickness has no effect on the cooling time. Internal pressure has no significant influence on thermal cycle curve when using the static device.关键词
在役焊接/16MnR钢/热循环/试验研究Key words
in - service welding /16MnR steel/ thermal cycle/ experimental study分类
机械制造引用本文复制引用
顾国林,薄国公,齐万鹏,王勇,韩涛..压力管道在役焊接热循环试验研究[J].压力容器,2012,29(12):32-36,5.基金项目
国家自然科学基金项目(51074174) (51074174)
山东省自然科学基金项目(ZR2010EM041) (ZR2010EM041)