立柱桩在深基坑分步开挖过程中的上拔位移分析

楼晓明 杨晶 李德宁 刘建航

岩土工程学报2013,Vol.35Issue(1):193-198,6.
岩土工程学报2013,Vol.35Issue(1):193-198,6.

立柱桩在深基坑分步开挖过程中的上拔位移分析

Uplift displacement of soldier piles during stepped excavation of deep foundation pits

楼晓明 1杨晶 1李德宁 1刘建航1

作者信息

  • 1. 同济大学地下建筑与工程系,上海200092
  • 折叠

摘要

Abstract

Based on the new understanding about rebound stress and deformation at the bottom of deep foundation pits and the generalized load transfer method considering the additional load or deformation of the soil around piles, an analytical method is proposed for the uplift of soldier piles due to excavation. It can take many factors into account, e.g., variable cross-section character of soldier piles, installation and stepped excavation of strut system and construction situation, and it can be employed to analyze the load transfer behaviors of soldier piles. Because the uplift displacement of the soldier piles is easily monitored, the calculated results are easily compared with the measured ones, which can improve the method itself and the parameters to be chosen more reasonably. Through two cases, the rationality of the proposed method to calculate the uplift displacement of soldier piles is validated. The difference between the calculated and the measured values is also discussed.

关键词

深基坑/立柱桩/荷载传递法/隆起/上拔位移

Key words

deep foundation pit/ soldier pile/ load transfer method/ heave/ uplift displacement

分类

建筑与水利

引用本文复制引用

楼晓明,杨晶,李德宁,刘建航..立柱桩在深基坑分步开挖过程中的上拔位移分析[J].岩土工程学报,2013,35(1):193-198,6.

基金项目

国家自然科学基金项目(50978201) (50978201)