| 注册
首页|期刊导航|岩土力学|降雨条件下大型滑坡体渗流稳定性分析

降雨条件下大型滑坡体渗流稳定性分析

张玉 徐卫亚 邹丽芳 孙怀昆

岩土力学2013,Vol.34Issue(3):833-841,9.
岩土力学2013,Vol.34Issue(3):833-841,9.

降雨条件下大型滑坡体渗流稳定性分析

Analysis of seepage stability of large-scale landslide under rainfall condition

张玉 1徐卫亚 2邹丽芳 2孙怀昆2

作者信息

  • 1. 中国石油大学(华东)储运与建筑工程学院,山东青岛266580
  • 2. 河海大学岩土工程科学研究所,南京210098
  • 折叠

摘要

Abstract

The large-scale landslides, widely distributed in southwest mountains and canyons, are prone to produce instability due to rainfall. In Gushui hydropower station, not only is the extremely large volume of Zhenggang large landslide accumulation body up to more than 4 750× 104 m3, but also the thicknesses of many ultra-deep landslide are over 50 m. Under the influences of the heavy rainfall in 2008, the landslide started to deform again and even more seriously. According to the results of field engineering geological investigation and analysis of geologic structure characteristics and hydrogeology conditions, the mechanism of rainfall infiltration and stability in the current situation was qualitatively analyzed first. Then the whole landslide was transfixed slipping surface in the state of creep deformation; so it should be treated such as excavating and reinforcing. Combined with the analysis result, quantitative study of the seepage properties of landslide showed the dynamic sliding mechanism that water infiltration caused deformation, evaluated the stability and treatment, thus proposed effective drainage measures before and after the treatment under the rainfall. The results also showed that the saturation line and backwater was formed due to saturated soil by infiltration. Before the treatment, the backwater was seriously persisted in local landslide and slip surface; and the worst stability came out 4 days later after the rain stopped; and the maximum thickness of backwater increased up to 6 m. However, with backwater reduced obviously, the stability was significantly increased by the treatment. The results truly reflected the situations and laws of the stability of landslide, which were consistent with the rssults of field exploration. The results were significantly improved by the treatment. Drainage measures proposed would keep the landslide's stability efficiently. The research results will be useful and meaningful in the same projects as reference.

关键词

水电站/大型滑坡堆积体/降雨/非饱和/渗透特性/稳定性/排水措施

Key words

hydropower station/ large-scale landslide accumulation body/ rainfall/ unsaturation/ seepage properties/ stability/ drainage measure

分类

建筑与水利

引用本文复制引用

张玉,徐卫亚,邹丽芳,孙怀昆..降雨条件下大型滑坡体渗流稳定性分析[J].岩土力学,2013,34(3):833-841,9.

基金项目

国家自然科学基金和法国国家科研署联合基金项目(No.50911130366) (No.50911130366)

江苏省科研创新计划(No.CX10B-205Z). (No.CX10B-205Z)

岩土力学

OA北大核心CSCDCSTPCD

1000-7598

访问量0
|
下载量0
段落导航相关论文