火力与指挥控制2013,Vol.38Issue(2):35-39,5.
预防性维修工作组合优化
Study on Optimal Maintenance Level Based on Preventive Group Maintenance Police
摘要
Abstract
Considering maintenance period single components' cannot replace the system's optimal period, preventive maintenance based on different ability of the maintenance level has been studied. From system optimal view, the cost model, availability model and hazard model are set up to group the components of the system maintenance level and period considering with the realistic of the army. The result can offer scientific and reasonable theory guidance for level-decision. This arithmetic can optimize the group maintenance taking the different ability of different maintenance level into account. At last, an example is demonstrated to prove the model is practical and efficient.关键词
维修等级/优化组合策略/维修间隔期Key words
maintenance level/optimal group decision/maintenance period分类
军事科技引用本文复制引用
李欣玥,贾云献,白永生..预防性维修工作组合优化[J].火力与指挥控制,2013,38(2):35-39,5.基金项目
国家自然科学基金资助项目(70970035) (70970035)