| 注册
首页|期刊导航|水力发电|溧阳抽水蓄能电站枢纽布置设计

溧阳抽水蓄能电站枢纽布置设计

宁永升 胡育林 胡旺兴 胡林江

水力发电2013,Vol.39Issue(3):29-31,3.
水力发电2013,Vol.39Issue(3):29-31,3.

溧阳抽水蓄能电站枢纽布置设计

Layout Design of Liyang Pumped-storage Power Station

宁永升 1胡育林 1胡旺兴 1胡林江1

作者信息

  • 折叠

摘要

Abstract

The topographic and geologic conditions in Liyang Pumped-storage Power Station are particularly complex, in which the surrounding rocks are mainly classified as Class III and IV, and local as Class V. The dam type and structure layout are selected in accordance with the actual conditions of power station. The key technical problems in the design of upper reservoir, water delivery system, underground powerhouse and lower reservoir, such as the stability of surrounding rocks of large-span underground powerhouse cavern, the filling of high CFRD with complex material source, the backfilling of reservoir basin bottom and basin seepage control, the design of diversion steel bifurcation with high PD value and the design of shaft-type inlet/outlet, are systematically studied, and the reasonable technical solution are finally determined.

关键词

设计/枢纽布置/溧阳抽水蓄能电站

Key words

design/ structure layout/ Liyang Pumped-storage Power Station

分类

建筑与水利

引用本文复制引用

宁永升,胡育林,胡旺兴,胡林江..溧阳抽水蓄能电站枢纽布置设计[J].水力发电,2013,39(3):29-31,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文