水力发电2013,Vol.39Issue(3):44-45,2.
溧阳抽水蓄能电站地下厂房洞室群布置研究
Study on Cavern Layout for Underground Powerhouse of Liyang Pumped-storage Power Station
摘要
Abstract
Based on engineering geological conditions of Liyang Pumped -storage Power Station, the cavern layout of underground powerhouse is studied in detaic, in which, the location and longitudinal axis direction of underground powerhouse and the ball valve layout are specially argued. The layout of other main structures in underground caverns is also introduced herein. The geological conditions revealed by current construction and excavation are basically consistent with investigation results, and this further confirms that the layout scheme of underground caverns is reasonable and feasible.关键词
洞室布置/地质特性/地下厂房/溧阳抽水蓄能电站Key words
cavern layout/ geological characteristic/ underground powerhouse/ Liyang Pumped-storage Power Station分类
建筑与水利引用本文复制引用
胡林江,文学军,胡梦蛟..溧阳抽水蓄能电站地下厂房洞室群布置研究[J].水力发电,2013,39(3):44-45,2.