水力发电2013,Vol.39Issue(3):88-91,4.
溧阳抽水蓄能电站混凝土配合比优化
Optimization of Concrete Mix Proportion in Liyang Pumped-storage Power Station
摘要
Abstract
The early concrete mix proportion testes for Liyang Pumped-storage Power Station show that, comparing with standard concrete, the cement and water utilization in concrete is larger and the frost indexes are difficult to meet design requirements. The study shows that higher powder content in gravel aggregate is the cause. By strengthening raw material mining management and transforming aggregate processing system to reduce the content of particles with a size less than 0.075 mm in aggregate, and optimizing the mix proportion of concrete, the water utilization and frost resistance of concrete meet the requirements of design, and the cement utilization is reduced to achieve economic target.关键词
人工砂/骨料/混凝土配合比/石粉含量/溧阳抽水蓄能电站Key words
artificial sand/ aggregate/ concrete mix proportion/ powder content/ Liyang Pumped-storage Power Station分类
建筑与水利引用本文复制引用
兰肃,吴书艳..溧阳抽水蓄能电站混凝土配合比优化[J].水力发电,2013,39(3):88-91,4.