三峡升船机齿条和螺母柱一期埋件PVC套管安装测量方法

魏兰花 李俊波 刘启寿

水利水电技术2013,Vol.44Issue(4):26-28,3.
水利水电技术2013,Vol.44Issue(4):26-28,3.

三峡升船机齿条和螺母柱一期埋件PVC套管安装测量方法

Measuring method for installation of PVC sleeves for Phase Ⅰ embedded parts of racks and nut-columns for ship-lift of Three Gorges Project

魏兰花 1李俊波 1刘启寿1

作者信息

  • 折叠

摘要

Abstract

The measuring method for installation of PVC sleeves for Phase I embedded parts of racks and nut-columns for ship-lift of Three Gorges Project is introduced herein, and an estimation is made on the precision of the installation measurement This measuring method for installation of PVC sleeves is demonstrated by both the result of the measurement made after the PVC sleeve for Phase I embedded part being concreted and the actual effect of the installation of the Phase II embedded part and equipment.

关键词

升船机/齿条/螺母柱/PVC套管/测量方法/精度估算

Key words

ship-lift/rack/nut-column/PVC sleeve/measuring method/precision estimation