机械与电子Issue(3):3-6,4.
制动时间对起重机制动器温升的影响研究
Research on Crane Brake Temperature Rise Influenced by Braking Time
摘要
Abstract
According to the work characteristic and the real dimension of the braking disc and the linings,the 3-D finite element model of frictional heating was established by ABAQUS software. The different temperature fields distribution of the linings were obtained through setting different braking time in the process of simulation. Then according to the result of simulation the counter-measures was put forward to control temperature rising of the crane brake.关键词
起重机/盘式制动器/摩擦生热/温度场/制动时间Key words
crane/ disc brake/ frictional heating/ temperature fields分类
机械制造引用本文复制引用
姚文庆,刘华,周建波,许海翔..制动时间对起重机制动器温升的影响研究[J].机械与电子,2013,(3):3-6,4.基金项目
国家质检总局科技计划项目(2012QK275) (2012QK275)
上海市质量技术监督局科技项目(2012-50) (2012-50)