To make full use of the overhead line corridor, development of AC/DC transmission lines on the same tower will be a future trend for power grid. It is therefore of great significance to study the electromagnetic coupling interference of AC/DC transmission lines on the same tower. The coupling model of double-circuit AC and single-circuit DC transmission lines was established based on PSCAD/EMTDC in this paper. The results show that the electromagnetic coupling component of DC lines are smaller when AC lines are arranged in inverted triangle and the phase conductors are arranged in ABC/ACB. The balance of electrical parameters are severely damaged by AC lines fault, leading to the increasing of electromagnetic coupling component of DC lines. The more the coupling ground wires are, the better the shielding effect is. The shielding effect tends to saturation when the number of coupling ground wires reaches a certain number.关键词
交直流同塔/电磁耦合/排列方式/线路故障/耦合地线/PSCAD/EMTDCKey words
AC/DC on the same tower/ electromagnetic coupling/ arrangement/ line fault/ coupling ground wires/ PSCAD/EMTDC分类
信息技术与安全科学引用本文复制引用
吴驰,张龙伟,朱军,吴广宁,石超群,吴静文..共走廊同塔交直流输电线路电磁耦合分量的计算分析[J].中国电力,2013,46(4):43-47,5.基金项目
国家电网公司科技资助项目(2011-WG-4) (2011-WG-4)