南方电网技术2012,Vol.6Issue(z1):32-35,4.
HY型高端换流变压器阀侧绕组间接出线安装关键工艺
The Key Technics for Valve-side Indirect Outlet Winding Installation of HY-type High Voltage Side Converter Transformer
孙勇 1谢超 1刘红太1
作者信息
- 1. 中国南方电网超高压输电公司,广州510620
- 折叠
摘要
Abstract
The HY-type converter transformer in Yunnan-Guangdong DC project is the first one in the world, which has a very complex structure and requires high technic level of constructure and installation. An indirect outlet conformation is adopted by the transformer, and it is favorable for heavy-cargo transportation, but faces much more difficulty in the installation. This paper introduces the experience of HY-type converter transformer installation and related key technics, including wire connection, insulation binding, bushing davit-mounting, vacuum dry, oil process, traction location and hand-over test.关键词
换流变压器/间接出线/关键工艺Key words
converter transformer/ indirect outlet/ key technology分类
信息技术与安全科学引用本文复制引用
孙勇,谢超,刘红太..HY型高端换流变压器阀侧绕组间接出线安装关键工艺[J].南方电网技术,2012,6(z1):32-35,4.