HY型高端换流变压器阀侧绕组间接出线安装关键工艺

孙勇 谢超 刘红太

南方电网技术2012,Vol.6Issue(z1):32-35,4.
南方电网技术2012,Vol.6Issue(z1):32-35,4.

HY型高端换流变压器阀侧绕组间接出线安装关键工艺

The Key Technics for Valve-side Indirect Outlet Winding Installation of HY-type High Voltage Side Converter Transformer

孙勇 1谢超 1刘红太1

作者信息

  • 1. 中国南方电网超高压输电公司,广州510620
  • 折叠

摘要

Abstract

The HY-type converter transformer in Yunnan-Guangdong DC project is the first one in the world, which has a very complex structure and requires high technic level of constructure and installation. An indirect outlet conformation is adopted by the transformer, and it is favorable for heavy-cargo transportation, but faces much more difficulty in the installation. This paper introduces the experience of HY-type converter transformer installation and related key technics, including wire connection, insulation binding, bushing davit-mounting, vacuum dry, oil process, traction location and hand-over test.

关键词

换流变压器/间接出线/关键工艺

Key words

converter transformer/ indirect outlet/ key technology