黄骅港三期工程储煤筒仓滑模系统的设计与拼装
Design and Consolidation of Slip-form System for Coal Storage Silo of Huanghua Port Phase-3 Project
严密 1吴翔2
作者信息
- 1. 中交第一航务工程局第四工程有限公司,天津300456
- 2. 中交第一航务工程勘察设计院有限公司,天津300222
- 折叠
摘要
Abstract
To conform to the trend of building the environmental protection ports in China, Shenhua Group firstly adopts the coal storage silo instead of the traditional open coal stockpile in Huanghua coal Terminal Phase-3 Project, which has never been used in the existing coal transfer ports in China before. The application of coal storage silo may decrease coal dust pollution in the port. The design and consolidation technology of slip-form system are introduced in detail for the coal storage silo of Shenhua Huanghua Port Phase-3 Project, which will provide references for the construction of similar silos.关键词
环境友好型港口/煤码头/储煤筒仓/滑模工艺Key words
environmental protection port/ coal terminal/ coal storage silo/ slip-form technology分类
建筑与水利引用本文复制引用
严密,吴翔..黄骅港三期工程储煤筒仓滑模系统的设计与拼装[J].港工技术,2012,49(6):42-44,3.