| 注册
首页|期刊导航|铁道科学与工程学报|高速铁路连续梁桥三分力系数的数值模拟分析

高速铁路连续梁桥三分力系数的数值模拟分析

杨靖 何旭辉 冉瑞飞 姜超

铁道科学与工程学报2013,Vol.10Issue(1):11-15,5.
铁道科学与工程学报2013,Vol.10Issue(1):11-15,5.

高速铁路连续梁桥三分力系数的数值模拟分析

Numerical simulation analysis of tri-component force coefficient of continuous beam bridge on high-speed railway

杨靖 1何旭辉 1冉瑞飞 1姜超1

作者信息

  • 1. 中南大学土木工程学院,湖南长沙410075
  • 折叠

摘要

Abstract

Continuous beam bridge is a typical bridge form on high-speed railway.A CFD software was used to simulate and calculate tri-component force coefficient of continuous beam bridge on high-speed railway under different operating conditions.The effect of average wind speed attack angle,aspect ratio and the distribution of train on tri-component force coefficient of bridge section was investigated respectively.The results indicate that both wind speed and attack angle have an obvious influence on bridge' s aerostatic performance,and the increase of beam height leads to the corresponding increase of wind load,and bridge's aerostatic performance under the presence of train is less stable than that without train varies with the situation of train on bridge.

关键词

高速铁路/连续梁桥/风-车-桥系统/三分力系数/风攻角

Key words

high-speed railway / continuous beam bridge / wind-vehicle-bridge system / tri-component force coefficient/ attack angle

分类

交通工程

引用本文复制引用

杨靖,何旭辉,冉瑞飞,姜超..高速铁路连续梁桥三分力系数的数值模拟分析[J].铁道科学与工程学报,2013,10(1):11-15,5.

基金项目

国家自然科学基金资助项目(51178471) (51178471)

铁道科学与工程学报

OA北大核心CSCDCSTPCD

1672-7029

访问量0
|
下载量0
段落导航相关论文