电力系统自动化2013,Vol.37Issue(7):42-47,6.DOI:10.7500/AEPS201208047
面向供电能力提升的主变压器站间联络结构优化建模
Optimization Modeling for Contact Structure of Main Transformers Between Substations with Improved Power Supply Capability
摘要
Abstract
In order to effectively solve the problems confronted in the process of rapid urban economic development, such as substation layout and corridor scarcity, this paper deals with a contact structure optimization model for the main transformers between substations based on power supply capacity. First, on the basis of a thorough analysis of the main transformer N—1 calibration and the process of second load transfer when the main transformer is overloaded, the optimization calculation model of maximum power supply capacity applied in distribution network is improved. Furthermore, to improve the regional power supply capacity and simplify contact corridors, a multi-objective optimization model for the contact structure of main transformers between substations is built and solved by the genetic algorithm. Finally, the validity and effectiveness of the proposed method is verified by an analysis of an example. The work is supported by National Natural Science Foundation of China (No. 51107085).关键词
配电系统/供电能力/联络通道/遗传算法Key words
distribution system/ power supply capacity/ contact corridors/ genetic algorithm引用本文复制引用
韩俊,刘洪,葛少云,刘阳..面向供电能力提升的主变压器站间联络结构优化建模[J].电力系统自动化,2013,37(7):42-47,6.基金项目
国家自然科学基金资助项目(51107085). (51107085)