电力系统自动化2013,Vol.37Issue(11):26-32,7.DOI:10.7500/AEPS201206103
基于区间数的黑启动决策方法
A Black-start Decision-making Method Based on Interval Values
摘要
Abstract
An optimal black-start decision-making scheme plays an important role in the rapid recovery of a power system after a blackout.In the black-start decision-making process,uncertainties are inevitable.Specifically,some factors and weights having impacts on the black-start decision-making are better described as uncertain interval quantities or values.So far,the black-start decision-making problem with uncertain quantities described as interval values has not been investigated throughly.Given this,a black-start decision-making method capable of handling interval values and weights of indices is developed.An interval black-start decision-making matrix is first normalized by the error propagation theory; then,a linear goal programming model is presented to seek the ideal vector of index weights in the black-start decision-making based on the normalized matrix.The evaluation results with interval numbers are ranked on the basis of the risk attitude factors defined by the decision-makers.Finally,a scenario associated with a local power system is served for demonstrating the essential feature of the proposed method.Simulation results demonstrate that the developed interval-value based black-start decision-making method could better describe the actual decision-making process.关键词
黑启动决策/区间数/误差传递/线性目标规划/风险态度因子Key words
black-start decision-making/ interval values/ error propagation/ linear goal programming/ risk attitude factor引用本文复制引用
王宏,林振智,文福拴,薛禹胜,郭锋,吴烨..基于区间数的黑启动决策方法[J].电力系统自动化,2013,37(11):26-32,7.基金项目
国家高技术研究发展计划(863计划)资助项目(2011AA05A105) (863计划)
国家自然科学基金资助项目(51007080) (51007080)
中央高校基本科研业务费专项资金资助项目(2012QNA4011) (2012QNA4011)
浙江省电力公司重点科技项目.This work is supported by National High Technology Research and Development Program of China (863 Program) (No.2011AA05A105),National Natural Science Foundation of China (No.51007080),Fundamental Research Funds for the Central Universities (No.2012QNA4011),and a key project from Zhejiang Electric Power Corporation. (863 Program)