| 注册
首页|期刊导航|高压电器|变压器震后剩余寿命评估模型的研究

变压器震后剩余寿命评估模型的研究

张蓬鹤 邓泽官 吴巍 李龙江

高压电器2013,Vol.49Issue(6):62-66,5.
高压电器2013,Vol.49Issue(6):62-66,5.

变压器震后剩余寿命评估模型的研究

Study of Transformer Remaining Life Evaluation After Earthquake

张蓬鹤 1邓泽官 1吴巍 1李龙江2

作者信息

  • 1. 国家电力科学研究院,武汉430074
  • 2. 四川省电力公司,成都610015
  • 折叠

摘要

Abstract

Power is the momentum of the national economy.After 5.12 Wenchuan M8.0 earthquake,transformers come through a devastating test of exceed endure capability,and the loss are very heavy.For understanding and analyzing the status of transformers,it needs to investigate and evaluate the remaining life of transformer after the earthquake so as to ensure the stability and safety function of the transformers at work.The remaining life predict of transformers can afford the foundation of the whole longevity manage and safety function.Statistics,numerical analysis,neural network,administrant science and architectonics are integrated with the remaining life evaluation of transformers in this paper,establishing the flexible model of transformers remaining life evaluation by the reliability.Through the sample collecting and regulating of the transformer during the thirteen regions of the Sichuan province before and after Wenchuan earthquake,integrating the datum of the domestic and overseas earthquake data-base and the method of the sample test on-site,the life loss degree are calculated as an example.These afford the foundation for the safety and reliability function of transformers after the earthquake.

关键词

变压器/地震/剩余寿命评估/柔性模型

Key words

transformer/earthquake/remaining life evaluation/flexible model

分类

信息技术与安全科学

引用本文复制引用

张蓬鹤,邓泽官,吴巍,李龙江..变压器震后剩余寿命评估模型的研究[J].高压电器,2013,49(6):62-66,5.

基金项目

国家公益性行业科研专项资助项目(201008005) (201008005)

Project Supported by National Public Indudtry Research and Special Projects(201008005). (201008005)

高压电器

OA北大核心CSCD

1001-1609

访问量0
|
下载量0
段落导航相关论文