海洋测绘2013,Vol.33Issue(3):43-46,4.DOI:10.3969/j.issn.1671-3044.2013.03.011
水深测量作业中的测线布设与实施策略研究
Study on Sounding Survey Line Planning and Running Strategy
柴进柱1
作者信息
- 1. 交通运输部北海航海保障中心,天津300211
- 折叠
摘要
Abstract
Check line survey is the most important means to evaluate the accuracy and reliability of final soundings.Based on a comprehensive study on the related requirements of the sounding survey line planning,this paper proposes the survey-line layout and running strategy with an emphasis on check line and provides the theoretical basis and technical support for depth soundings.关键词
水深测量/测线布设/主测线,检查线/实施策略Key words
sounding/survey line layout/main line/check line/running strategy分类
天文与地球科学引用本文复制引用
柴进柱..水深测量作业中的测线布设与实施策略研究[J].海洋测绘,2013,33(3):43-46,4.