Combining with substantial highway engineering,efficiency factor of bearing capacity of composite foundation was calculated through soil pressure monitoring at the section for site test and,with failure mode,it was analyzed as well.The study result shows that for granular pile composite foundation,the efficiency factor of bearing capacity calculated in terms of earth mass failure taken place first is close to the result of on-site load test and the bearing capacity may be calculated through soil pressure between piles/piers.In addition,the failure mode is such that the whole composite foundation is destroyed in the event that the soil between piles (piers) is destructed at first,regardless of dynamic replacement gravel pier or vibration gravel pile.关键词
公路工程/粒料桩复合地基/土压力/地基承载力发挥值/试验研究Key words
highway engineering/ granular pile composite foundation/ soil pressure/ efficiency factor of bearing capacity/ experimental study分类