乌江沙沱水电站水轮机选型分析

高瑜 赵明琴

水力发电2013,Vol.39Issue(7):77-80,4.
水力发电2013,Vol.39Issue(7):77-80,4.

乌江沙沱水电站水轮机选型分析

Selection Analysis for Turbine of Shatuo Hydropower Station in Wujiang River

高瑜 1赵明琴2

作者信息

  • 1. 中国水电工程顾问集团公司,北京100120
  • 2. 中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550081
  • 折叠

摘要

Abstract

The operation head of Shatuo Hydropower Station is between 50 m to 74.9 m.The blocked output of Station mostly occurs in flood season.By comprehensively considering the reduction of blocked output and the operation stability of turbine,five rated head schemes of 61,62.5,64,65.5,67 m are analyzed and compared.The economic and reasonable turbine parameters are finally proposed.

关键词

水轮机选型/转轮/额定水头/沙沱水电站

Key words

type selection for turbine/ runner/ rated head/ Shatuo Hydropower Station

分类

信息技术与安全科学

引用本文复制引用

高瑜,赵明琴..乌江沙沱水电站水轮机选型分析[J].水力发电,2013,39(7):77-80,4.