| 注册
首页|期刊导航|工矿自动化|光伏电池最大功率点跟踪方法比较

光伏电池最大功率点跟踪方法比较

贺永辉 李岚

工矿自动化2013,Vol.39Issue(6):81-84,4.
工矿自动化2013,Vol.39Issue(6):81-84,4.DOI:10.7526/j.issn.1671-251X.2013.06.021

光伏电池最大功率点跟踪方法比较

Comparison of methods of maximum power point tracking of photovoltaic cells

贺永辉 1李岚1

作者信息

  • 1. 太原理工大学电气与动力工程学院,山西太原030024
  • 折叠

摘要

Abstract

According to engineering mathematics model of solar photovoltaic cells,a simulation model of photovoltaic cells was established in Matlab,influences of changed light intensity and temperature on output characteristics of the photovoltaic cells were analyzed.In view of problem that it is difficult to get higher tracking accuracy and response speed by use of perturbation and observation method which applied fixed perturbation step,an improved perturbation and observation method based on variable step was proposed.Through simulating photovoltaic cells control system,simulation curves of the two methods of maximum power point tracking were compared.The simulation results show that the photovoltaic cells control system can track maximum power point more quickly and has better stability at maximum power point by use of the improved perturbation and observation method.

关键词

光伏电池/最大功率点跟踪/扰动观察法/变步长/Matlab仿真

Key words

photovoltaic cells/ maximum power point tracking/ perturbation and observation method/ variable step/ Matlab simulation

分类

矿业与冶金

引用本文复制引用

贺永辉,李岚..光伏电池最大功率点跟踪方法比较[J].工矿自动化,2013,39(6):81-84,4.

基金项目

山西省自然科学基金资助项目(2008011037). (2008011037)

工矿自动化

OA北大核心CSTPCD

1671-251X

访问量0
|
下载量0
段落导航相关论文