| 注册
首页|期刊导航|水力发电|亭子口水利枢纽工程550 kV GIS安装技术

亭子口水利枢纽工程550 kV GIS安装技术

韩兴国

水力发电2013,Vol.39Issue(6):52-54,3.
水力发电2013,Vol.39Issue(6):52-54,3.

亭子口水利枢纽工程550 kV GIS安装技术

Installation Technologies of 550 kV GIS in Tingzikou Water Control Project

韩兴国1

作者信息

  • 1. 长江勘测规划设计研究院,湖北武汉430015
  • 折叠

摘要

Abstract

Based on the layout design of 550 kV GIS in Tingzikou Water Control Project,the installation technologies of closing installation chamber and placing it at a standstill for dust removing are proposed.The application of DILO vacuum pumps and the optimization of installation processes reduce the installation duration.Combining with the structural characteristics of GIS,the step-by-step withstand voltage test and the partial discharge detection after installing voltage transformers and surge arresters are carried out respectively.At present,the commissioning and on-site withstand voltage tests of 550 kV GIS in Tingzikou Project are qualified at the first time,and shows that the installation technologies meet engineering requirements.

关键词

550 kV GIS/安装/试验/亭子口水利枢纽工程

Key words

550 kV GIS/installation/test/Tingzikou Water Control Project

分类

建筑与水利

引用本文复制引用

韩兴国..亭子口水利枢纽工程550 kV GIS安装技术[J].水力发电,2013,39(6):52-54,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量4
|
下载量0
段落导航相关论文