亭子口水利枢纽工程500 kV变压器安装技术

练柳君

水力发电2013,Vol.39Issue(6):58-59,66,3.
水力发电2013,Vol.39Issue(6):58-59,66,3.

亭子口水利枢纽工程500 kV变压器安装技术

Installation Technologies of 500 kV Transformers in Tingzikou Water Control Project

练柳君1

作者信息

  • 1. 嘉陵江亭子口水利水电开发有限公司,四川苍溪628400
  • 折叠

摘要

Abstract

Combining with the layout design of 500 kV transformers in Tingzikou Water Control Project,the artificial unloading,the "Full Equivalent In-air Time" for inner checking and the induced voltage tests with frequency conversion are used in the installation of transformers.These installation technologies ensure that the transformer installation meets the requirements of engineering,and can be as reference to similar projects.

关键词

500 kV变压器/安装/试验/亭子口水利枢纽工程

Key words

500 kV transformer/installation/test/Tingzikou Water Control Project