The installation of steel lining for the bottom outlets of dam in Tingzikou Water Control Project has some characteristics and difficulties,such as a tighter duration,only side lining in the outlet sections optimized from original design of side and bottom lining,position at inclined planes and special lifting equipments,total 10 inlet and outlet sections being constructed at the same time.Through reasonable and meticulous construction planning,the construction schedule and project quality are guaranteed by the means of assembling first and then installing.The installation of steel lining for bottom outlets also ensures the pouring schedule of dam concrete.

关键词

底孔/钢衬/安装/亭子口水利枢纽工程

Key words

bottom outlet/steel lining/installation/Tingzikou Water Control Project