水力发电2013,Vol.39Issue(6):69-70,79,3.
亭子口水利枢纽大坝底孔钢衬安装技术简述
Steel Lining Installation Techniques of Bottom Outlet in the Dam of Tingzikou Water Control Project
赵善平1
作者信息
- 1. 中国水利水电第七工程局有限责任公司,四川成都610081
- 折叠
摘要
Abstract
The installation of steel lining for the bottom outlets of dam in Tingzikou Water Control Project has some characteristics and difficulties,such as a tighter duration,only side lining in the outlet sections optimized from original design of side and bottom lining,position at inclined planes and special lifting equipments,total 10 inlet and outlet sections being constructed at the same time.Through reasonable and meticulous construction planning,the construction schedule and project quality are guaranteed by the means of assembling first and then installing.The installation of steel lining for bottom outlets also ensures the pouring schedule of dam concrete.关键词
底孔/钢衬/安装/亭子口水利枢纽工程Key words
bottom outlet/steel lining/installation/Tingzikou Water Control Project分类
建筑与水利引用本文复制引用
赵善平..亭子口水利枢纽大坝底孔钢衬安装技术简述[J].水力发电,2013,39(6):69-70,79,3.