水力发电2013,Vol.39Issue(6):84-85,88,3.
亭子口水利枢纽三期下游全年围堰设计与施工
Design and Construction of Downstream All-year Cofferdam for the Phase-Ⅲ Diversion of Tingzikou Water Control Project
孔令富1
作者信息
- 1. 中国水利水电第七工程局有限公司,四川成都610081
- 折叠
摘要
Abstract
Under the protection of phase-Ⅲ upstream and downstream dry-season cofferdams,the downstream phase-Ⅲ allyear cofferdam in Tingzikou Water Control Project can be constructed in dry environment.Based on the actual condition,the construction method of downstream phase-Ⅲ all-year cofferdam is optimized.The pouring of cofferdam concrete core wall below normal low-water level is completed in dry season,and after flood season,the pumping of pit and the excavation of pit foundation is immediately conducted when the water level is below than the top of core wall.The construction method of phase-Ⅲ all-year cofferdam can speed up the construction and saves the costs on cofferdam filling material excavation and transportation.关键词
三期围堰/混凝土心墙/设计/施工/亭子口水利枢纽工程Key words
phase-Ⅲ cofferdam/concrete core wall/design/construction/Tingzikou Water Control Project分类
建筑与水利引用本文复制引用
孔令富..亭子口水利枢纽三期下游全年围堰设计与施工[J].水力发电,2013,39(6):84-85,88,3.