| 注册
首页|期刊导航|铁道标准设计|盾构隧道下穿城铁地面线施工风险分析及对策研究

盾构隧道下穿城铁地面线施工风险分析及对策研究

曲强 于鹤然

铁道标准设计Issue(6):88-91,4.
铁道标准设计Issue(6):88-91,4.

盾构隧道下穿城铁地面线施工风险分析及对策研究

Construction Risk Analysis and Countermeasure Research for Shield Tunnel Passing beneath Surface Route of Urban Metro

曲强 1于鹤然2

作者信息

  • 1. 中铁工程设计咨询集团有限公司,北京100055
  • 2. 西南交通大学交通隧道工程教育部重点实验室,成都610031
  • 折叠

摘要

Abstract

In the process of urban metro construction,it is quite frequent that a metro tunnel needs to pass beneath the existing surface structures.This paper,based on actual project and through field monitoring data analysis and other means,carried out research and discuss on the construction scheme of shield tunnel passing beneath the existing surface route of urban metro.The existing urban metro routes are often accompanied more stringent requirement on settlement deformation control of subgrade and track.Because of various restrictions,both the grouting method and the rail-buckling method could not be used in subsoil strengthening of this existing route.For this reason,other reasonable measures were adopted,such as arranging guardrail against derailment,adjusting the parameters of shield tunneling,and regulating the track deformations by increasing or decreasing the ballast during maintenance time and so on,and eventually the track deformations of the existing route were controlled successfully so that the operation safety of the existing route could be ensured.In the research,it was also found that the instability of shield earth pressure was one of the most important reasons which caused the surface subsidence.

关键词

盾构隧道/近接施工/监控量测

Key words

shield tunnel/ construction adjacent to existing structure/ monitoring and measurement

分类

交通工程

引用本文复制引用

曲强,于鹤然..盾构隧道下穿城铁地面线施工风险分析及对策研究[J].铁道标准设计,2013,(6):88-91,4.

铁道标准设计

OA北大核心CSTPCD

1004-2954

访问量0
|
下载量0
段落导航相关论文