辐射防护2013,Vol.33Issue(4):212-219,8.
北京正负电子对撞机重大改造工程的竣工验收辐射监测
Radiation Survey for Final Acceptance of Beijing Electron-Positron Collider Ⅱ Project
蒋婧 1阙骥 1杜娟 2胡翔 2马国学 2宋福祥 2顾洪坤2
作者信息
- 1. 环保部核与辐射安全中心,北京100082
- 2. 北京市辐射安全技术中心,北京100089
- 折叠
摘要
Abstract
The project of Beijing Electron-Positron Collider Ⅱ (BEPC Ⅱ) was successfully completed in May 2009 and Beijing Radiation Safety Technology Center carried out the radiation survey for the final acceptation of BEPC Ⅱ.The results showed that,in normal operation,the maximum annual effective dose for the occupational staff was 2.03 mSv and 11.7 μSv for the public,both were less than the specified limits.The power density values measured at sensitive points in the electromagnetic environment inside and outside of the experimental area were lower than the national standard limit of 0.4 W/m2.The activity density of natural radionuclide in the soil samples fell in the range of natural activity density.For the secondary loop cooling water from BEPC Ⅱ electron linac the total alpha activity concentration was 0.03 Bq/L and the total beta activity concentration was less than 0.014 Bq/L,both were below the standard limit.The total alpha and the total beta activity concentrations in the groundwater were both less than 0.1 Bq/L as class Ⅰ groundwater.关键词
对撞机/辐射水平/验收监测Key words
collider/ radioactive level/ environmental monitoring分类
能源科技引用本文复制引用
蒋婧,阙骥,杜娟,胡翔,马国学,宋福祥,顾洪坤..北京正负电子对撞机重大改造工程的竣工验收辐射监测[J].辐射防护,2013,33(4):212-219,8.