水力发电2013,Vol.39Issue(8):19-22,4.
溪洛渡水电站拱坝施工期坝基变形监测分析
Analysis on Deformation Monitoring Data of Arch Dam Foundation of Xiluodu Hydropower Station during Construction Period
摘要
Abstract
In order to understand the deformation and statue of arch dam foundation in Xiluodu Hydropower Station during construction,initial water storage and operation periods,the vertical and horizontal displacements of dam foundation are monitored and the monitoring data are preliminarily analyzed to keep dam safety and provide scientific basis for project management during construction and operation periods.The analyses show that the settlement of dam foundation is uniform and the variation complies with normal rules.关键词
拱坝/坝基变形/施工期/溪洛渡水电站Key words
arch dam/ dam foundation deformation/ construction period/ Xiluodu Hydropower Station分类
建筑与水利引用本文复制引用
胡长浩,周扬,兰溶,关容章..溪洛渡水电站拱坝施工期坝基变形监测分析[J].水力发电,2013,39(8):19-22,4.