| 注册
首页|期刊导航|水力发电|溪洛渡水电站水垫塘底板抗冲耐磨混凝土施工技术

溪洛渡水电站水垫塘底板抗冲耐磨混凝土施工技术

刘世哲 张洪毅 周扬

水力发电2013,Vol.39Issue(8):23-26,4.
水力发电2013,Vol.39Issue(8):23-26,4.

溪洛渡水电站水垫塘底板抗冲耐磨混凝土施工技术

Construction of Abrasion and Erosion Resistant Concrete in Plunge Pool of Xiluodu Hydropower Station

刘世哲 1张洪毅 1周扬1

作者信息

  • 1. 溪洛渡水力发电厂,云南永善657300
  • 折叠

摘要

Abstract

The flood discharge in Xiluodu Hydropower Station has a high head,high speed and large flow and contains a lot of sediment,which make a high quality requirement on abrasion and erosion resistant concrete construction on the bottom plate and ogee surface of plunge pool.To this end,the construction quality and progress of abrasion and erosion resistant concrete are guaranteed by optimizing mix proportion ratio,using reasonable construction process and regulating the construction.The on-site testing shows that the controls on shape,surface roughness and external appearance of abrasion and erosion resistant concrete in the plunge pool are good.

关键词

施工工艺/抗冲耐磨混凝土/水垫塘/溪洛渡水电站

Key words

construction technology/ concrete with abrasion and erosion resistance/ plunge pool/ Xiluodu Hydropower Station

分类

建筑与水利

引用本文复制引用

刘世哲,张洪毅,周扬..溪洛渡水电站水垫塘底板抗冲耐磨混凝土施工技术[J].水力发电,2013,39(8):23-26,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文