水力发电2013,Vol.39Issue(8):27-29,32,4.
溪洛渡水电站泄洪系统运行特点
Analysis on Flood Discharging System Operation Characteristics of Xiluodu Hydropower Station
摘要
Abstract
Xiluodu Hydropower Station is a hydropower project with narrow valley,high arch dam and huge flood discharge.The flood discharging system of Station consists of seven surface outlets,eight bottom outlets and four spillway tunnels,which are arranged according to the principle of "Decentralized flood discharging and zoned energy dissipation".The surface outlets are drop-in and the bottom outlets are upturned,and two nappes of surface and bottom outlets will collide in air and then fall into cushion pool for energy dissipation.Under normal operation mode,the bottom outlets are firstly used for flood discharge and then surface outlets,and the spillway tunnels is only used in the condition of outlets' discharge capacity being insufficient.关键词
泄洪系统/运行特点/消能方式/溪洛渡水电站Key words
flood discharging system/ operating characteristics/ energy dissipation way/ Xiluodu Hydropower Station分类
建筑与水利引用本文复制引用
童伟,杜利民,叶云昭..溪洛渡水电站泄洪系统运行特点[J].水力发电,2013,39(8):27-29,32,4.