溪洛渡水电站泄洪系统运行特点

童伟 杜利民 叶云昭

水力发电2013,Vol.39Issue(8):27-29,32,4.
水力发电2013,Vol.39Issue(8):27-29,32,4.

溪洛渡水电站泄洪系统运行特点

Analysis on Flood Discharging System Operation Characteristics of Xiluodu Hydropower Station

童伟 1杜利民 1叶云昭1

作者信息

  • 1. 溪洛渡水力发电厂,云南永善657300
  • 折叠

摘要

Abstract

Xiluodu Hydropower Station is a hydropower project with narrow valley,high arch dam and huge flood discharge.The flood discharging system of Station consists of seven surface outlets,eight bottom outlets and four spillway tunnels,which are arranged according to the principle of "Decentralized flood discharging and zoned energy dissipation".The surface outlets are drop-in and the bottom outlets are upturned,and two nappes of surface and bottom outlets will collide in air and then fall into cushion pool for energy dissipation.Under normal operation mode,the bottom outlets are firstly used for flood discharge and then surface outlets,and the spillway tunnels is only used in the condition of outlets' discharge capacity being insufficient.

关键词

泄洪系统/运行特点/消能方式/溪洛渡水电站

Key words

flood discharging system/ operating characteristics/ energy dissipation way/ Xiluodu Hydropower Station

分类

建筑与水利

引用本文复制引用

童伟,杜利民,叶云昭..溪洛渡水电站泄洪系统运行特点[J].水力发电,2013,39(8):27-29,32,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文