摘要

Abstract

The conventional pre-compressed water seal and the pressurized water seal are simultaneously used in water sealing of bottom outlet radial gates in Xiluodu Hydropower Station.The pre-control measures for pressurized water seals are specially developed in advance for three stages of design and type selection,installation and commissioning,as well as operation and management after learning lessons from other hydropower projects.Currently,the pressurized water seals are commissioning and achieve good results.In following operation,it is focused on the control program whether adapting various operating conditions and to improve system performance continuously.

关键词

充压水封/深孔弧门/溪洛渡水电站

Key words

pressurized water seal/ radial gate of bottom outlet/ Xiluodu Hydropower Station

分类

建筑与水利