首页|期刊导航|长江科学院院报|葛洲坝电厂调度对中华鲟产卵场水流条件的影响

葛洲坝电厂调度对中华鲟产卵场水流条件的影响OA北大核心CSCDCSTPCD

Influence of Gezhouba Project Dispatching on the Flow Condition of Chinese Sturgeon's Spawning Ground

中文摘要英文摘要

建立中华鲟产卵场三维水流数学模型,模拟葛洲坝电厂不同调度情况下产卵场水流条件;分析了葛洲坝下游近坝段适宜中华鲟产卵的水深、近底层流速和两者叠加的区域范围;研究了葛洲坝电厂调度对中华鲟产卵场水流条件影响,并初步提出了中华鲟产卵场水流条件改善措施.研究结果表明:葛洲坝下泄流量在15 000~6 000 m3/s范围变化时,适宜中华鲟产卵的水流区域范围随下泄流量减小相应减小;在下泄流量为6000 m3/s情况下,若下泄流量全由大江电厂泄流时有利于增大大…查看全部>>

A three-dimensional mathematical model of the flow at Chinese sturgeon's spawning ground was established.The flow condition in the presence of different dispatching operation modes of Gezhouba power station was simulated by this model.The area of water depth,bottom velocity and the superposing of the two suitable for Chinese sturgeon' s spawning in the downstream near the Gezhouba Project was analyzed.The influence of Gezhouba Project dispatching on the flow…查看全部>>

黄明海;郭辉;邢领航;姜伟;杨伟

长江科学院水力学研究所,武汉430010长江科学院水力学研究所,武汉430010长江科学院水力学研究所,武汉430010中国长江三峡集团公司中华鲟研究所,湖北宜昌443100长江科学院水力学研究所,武汉430010

农业科技

葛洲坝中华鲟产卵场调度水流条件

Gezhouba Project Chinese sturgeon spawning ground dispatching flow condition

《长江科学院院报》 2013 (8)

基于环境湍浮力流物理机理的显式代数应力模型研究

102-107,6

国家自然科学基金资助项目(11202037)"十二五"国家科技支撑计划课题(2012BAK10B04)中央级公益性科研院所基本科研业务费专项(CKSF2012026SL,CKSF2013024/SL,CKSF2013028/SL)

10.3969/j.issn.1001-5485.2013.08.022